We are a NICEIC Approved Contractor and fully competent in the complete design & build of electrical services for the commercial, industrial and public sectors, from the initial planning and design stage to a turn key project.

We take on every electrical job from small remedial jobs to large new substations and LV panel works. We have extensive experience in street lighting and external services along side our civil engineering department. We are well equipped to deliver projects promptly and cost effectively as we carry out all aspects of the job in house eliminating the need for sub contractors.

We take on all types of commercial, industrial and public sector electrical projects nationwide to suit our client’s needs.

Other services we can provide are:

  • Power and Lighting Installation

  • Lighting designs

  • Smart lighting controls

  • LED lighting upgrades

  • Gate and barrier automation

  • Emergency lighting installation and Maintenance

  • Distribution board upgrades

  • Main LV supplies and distribution

  • Electrical Installation Condition Reports (EICR)

  • Electric car Charging Points

  • DATA cabling and networking

  • PAT Testing

Examples of Our Work

Lamppost Replacement
New Distribution Board and Dado Trunking Added
Switch Gear Replacement
Installation of New Sub-Station
Panel Board Upgrade
LED Smart Lighting Upgrade
Flooring Track
Heaters and Air Conditioning Units
Feeder Pillar
UPS Units and DB Change
Exterior Lighting
Emergency Exit

Case Study

 NHS West Heath Hospital

We won the project at WHH to upgrade all of the main LV incoming supplies at the site. This was done in 3 phases.

  1. We changed the main LV panel in the main ward block on site. This was a major challenge as the existing panel was in the basement plant room, with limited access.
  2. We had to remove the old bus bar risers feeding each floor of the ward block and install new panel distribution boards on each floor, with new supplies.
  3. We replaced the main site LV panel and back-up generator. This again was a challenge as there was a major civils element to install new supply cabling and replace 50+ years old equipment with new, modern equipment, not to mention the challenges with having adequate space.

This whole job was carried out while the hospital was fully functioning. We used temporary generators to supply all areas of the site throughout the changeover periods. This had not been attempted before on a trust site. This project was completed on time, and we were recommended for a HEFNA award.

Contract Start Date: June 2022

Contract Completion Date: January 2023